Trishuli Hydropower Station is a peaking run-of-river hydropower station located at Trishuli bazaar of Nuwakot district in Nepal.
The project cost was INR 140 million.
The annual energy generation is 304.78 GWh.
Nepal Electricity Authority, a government-run organization, owns and operates this plant.
[1] The design flow is 45.66 m3/s and the rated head is 51.4 m.[2] Download coordinates as: