[1] The viaduct was completed in 1856 and spanned the Borovnica Valley along the route from Vienna to Trieste vie Ljubljana.
The structure was planned by Carl Ritter von Ghega and construction began in 1850, lasting until August 1856, when the first train crossed it.
It was supported by 24 columns built of dressed stone that stood on wooden pilings driven into the loamy marsh soil.
Water had seeped into the viaduct for decades, weakening the bricks, and the oak pilings that supported it were beginning to rot, with the result that the entire structure was gradually settling.
After the Italians withdrew, German forces built a bypass route past the viaduct because of the danger posed by increasingly frequent aerial attacks.