Governor Pascual station

The rails that cover the radius of this station was dismantled and replaced with standard gauge tracks.

In 2018, after consultations with the Malabon LGU, DOTr and PNR intended to restore the at-grade railway station here, despite no longer being a designated stop in the elevated Northrail system initially.

It is the most recent expansion of the Caloocan-FTI line beyond Caloocan, and the first time in 2 decades that there has been rail activity.

[4] Construction materials related to the NLEX Segment were moved to make way for the restoration of the at-grade rails.

It required the restoration of Samson Road level crossing, which was done on November 23, 2018,[5] which enables the PNR to serve Malabon once again.