Stone Crossing railway station

Train services from the station run eastbound to Gravesend and early morning and late evening onward to Gillingham.

Before rail privatisation, a ticket office was provided here, on the 'up' side, in the signal cabin adjacent to the level crossing gates at the eastern end of the station.

[1] Planning applications were lodged by Network Rail in the autumn of 2016 for a footbridge to be built (replacing the level crossing) at a reported cost of over £2 million.

[2] The level crossing permanently closed on 25 February 2018 and the following day an adjacent footbridge, with ramped access, was opened.

The typical off-peak service in trains per hour is:[4] Additional services, including trains to and from London Cannon Street via Woolwich Arsenal and Lewisham call at the station during the peak hours.