The tunnel is located at 700 metres (2,300 ft) above sea level, connecting the Gorski Kotar and Croatian Littoral regions.
Since the motorway was initially executed as a semi-motorway, the second tunnel tube was not excavated for a decade — its construction started August 2006, excavation was completed in August 2007, and the completed motorway, including the second Tuhobić Tunnel tube was opened on October 22, 2008.
[5][6] European Tunnel Assessment Program (EuroTAP), a tunnel safety assessment program supported by the European Commission, coordinated by FIA and led by German motoring club ADAC, tested Tuhobić Tunnel twice — once in 2004, when it achieved poor results, and once again in 2009 after implementation of EuroTAP safety recommendations.
[7] Traffic is regularly counted and reported by Autocesta Rijeka–Zagreb, operator of the A6 motorway and the tunnel, and published by Hrvatske ceste.
[8] Substantial variations between annual (AADT) and summer (ASDT) traffic volumes are attributed to the fact that the motorway carries substantial tourist traffic to Istria and Kvarner Gulf resorts.