It is the terminus of the standard gauge Spiez–Zweisimmen line (from north) and of the 1,000 mm (3 ft 3+3⁄8 in) Montreux–Zweisimmen and Zweisimmen–Lenk im Simmental lines (separately from south, Montreux–Lenk im Simmental line).
These are metre gauge tracks serving the Montreux–Lenk im Simmental line and terminate at the station.
On the east side is track 6, one of two dual gauge through tracks that connects the Montreux–Zweisimmen railway line with the Spiez–Zweisimmen railway.
[5][6] Track 8 is a metre gauge track serving trains to Lenk im Simmental over the Montreux–Lenk im Simmental line and terminates at the station.
Track 12 connects with the Spiez–Zweisimmen railway line and terminates at the station.