Ash railway station

The London and South Western Railway had running powers over this section of line, to North Camp, but it had never used them.

To the east is the former Ash Junction, 48 miles 34 chains (77.9 km) from Charing Cross, where the former route via Tongham left the North Downs Line 35 miles 50 chains (57.3 km) from Waterloo (via Worplesdon and milepost 30+1⁄4 at Guildford).

[3] When Sectorisation was introduced in the 1980s, the station was served by Network SouthEast until the Privatisation of British Railways.

Construction of a new road bridge to replace the A323 level crossing at the southeastern end of the station, began in September 2023.

The typical off-peak service is two trains per hour in each direction between Guildford and Farnham via Aldershot, operated by South Western Railway, and one train per hour in each direction between Reading and Gatwick Airport via Guildford, operated by Great Western Railway.

A 1912 Railway Clearing House map of lines around Ash railway station