Victory Bridge (New Jersey)

The bridge was designed with a record-setting 134-meter main span (440 ft)—the longest precast cantilever segmental construction in the United States.

The department estimated that by using this type of approach, it would reduce the duration of construction by at least one year and save millions of dollars in life cycle costs.

[4] Construction on the first half of the new high level fixed bridge across the Raritan River was completed on June 8, 2004.

[7][8] In February 2011, The City of Perth Amboy sent a resolution to Governor Chris Christie and the New Jersey General Assembly requesting the addition of a fence along the Victory Bridge.

[9] Following the temporary closure of the pedestrian sidewalks and bike lanes in October 2014, NJDOT officials installed five-foot-high (1.5 m) fences along both sides to prevent further suicides.

Photo of the original Victory Bridge