Fuel Manufacturing Pilot Plant

[2][6] The plant uses enriched uranium hexafluoride (UF6, 19.75% U235) as a raw material which is processed to produce the final MTR-type fuel elements.

[2][6] The FMPP is owned and operated by the Egyptian Atomic Energy Authority (AEA) at the Nuclear Research Center in Inshas, 60 kilometers northeast of Cairo.

[6][7][8] The Egyptian Atomic Energy Authority (AEA) contracted with the Argentine company INVAP to construct the Fuel Manufacturing Pilot Plant (FMPP) at the Nuclear Research Center in Inshas with the construction works began in 1995, with pre-operational tests in 1997, and a final complete production in December 1998.

[5] The National Atomic Energy Commission (CNEA) was responsible for the technology transfer and Egyptian staff training during the commissioning and installation of FMPP by personnel from the (Uranium Powder Manufacturing Plant) and the (Research Reactors Fuel Elements Plant) were both plants in CNEA served as a FMPP design basis.

[10] FMPP has a production design capacity of 40 fuel element per year, with a total uranium content of 2054 g each and 220 days of estimated annual working time in two shifts with 8 hours each, which is sufficient to ensure continuous ETRR-2 reactor operation.