Bank Foot Metro station

[citation needed] In March 1989, ICI Callerton closed, and freight services through the station ceased.

The extension used the alignment of the former freight line to the west of Bank Foot, ownership of which was transferred to the Metro.

[4] During the construction of the line, a dedicated bus service operated between Bank Foot and Newcastle International Airport.

[5] In October 2012, traffic enforcement cameras were installed at the level crossings at Bank Foot and Kingston Park.

The project saw improvements to accessibility, security and energy efficiency, as well as the re-branding of the station to the new black and white corporate colour scheme.

[9] The station is equipped with ticket machines, waiting shelter, seating, next train information displays, timetable posters, and an emergency help point on both platforms.

Bank Foot station, looking east in 1981, before the Airport extension was built