The station ceiling is transformed by curved grille shapes and lighting to present a rainbow effect; The station floor is made of natural stone with a rippled texture, which echoes the rainbow theme.
The ground part of the station at Exits A and C adopts a blue square design that is different from the exits of other stations, and the interior wall is made of colored tiles and rainbow glass to form a "rainbow wall".
At that time, only civil works had been completed on the station platform, and there were screen doors, escalators and elevators, as well as the necessary equipment.
The speed of Line 8 trains passing through the station had to be reduced, and after the opening of the northern extension of Line 8, there were also multiple sets of shields in front of the screen doors to cover them, so as to prevent passengers on the train from observing the unfinished platform when passing through the station.
3 exit of the station was topped out, before transferring to mechanical and electrical construction on June 19.
Paid linkways linking all concourses between all 4 lines will be built at Basement 2 of the whole Caihong Bridge station.
[8][14] From 9 September 2023, the authorities enclosed part of Liuhua Road for construction of the Line 22 station.