Zhongshanba station

[6] The station body of Line 11 and the Zhongshan 8th Road Transportation Hub project above it were constructed simultaneously.

The station originally had Exit B at the beginning of its opening, but it was closed and dismantled due to the construction of Line 11 in the later stage.

[13] Exit A, located on the south side of Zhongshan 8th Road, had its construction postponed to September 2013 due to land acquisition issues[14] and opened in early 2016.

Guangzhou Metro adjusted the operation plan of Line 5 and organized a bus connection, before resuming normal service at 12:08 noon on the same day.

In order to cooperate with the construction of the station, the concourse floor of Line 5 was temporarily renovated from June 10 to August 10.